Assembly&Logisitc Center

Efficiency and Sustainability: this is the new AEC Illuminazione Logistics Hub dedicated to logistics and assembly.

AEC’s new Assembly & Logistics Center is a 15,000m2 technological hub
located at the Headquarters, dedicated to logistics and assembly.
The plant combines advanced technology and refined aesthetics, designed to best represent the company’s identity.

 

Nuovo centro logistica e assemblaggio AEC Illuminazione

The plant stands out not only for its size and functionality, but also for a design with attention to every detail that combines operational efficiency, style and elegance.
This new center represents a step forward towards more efficient logistics and production capacity that reflects the highest quality standards.

Assembly&Logistic Center is equipped with the most advanced technologies
of automation and artificial intelligence. These systems allow
to monitor and optimize every phase of the production process, guaranteeing constant quality and reduced production times. The integration of AI allows you to predict and resolve any problems in real time, improving operational efficiency.

1.4kW

Photovoltaic

5

Automatic Warehouses

602K

Pieces produced annually

28K

Total pallet capacity

The architecture of the plant is characterized by thoughtful internal
and external spaces to guarantee a stimulating and cutting-edge working environment.
Large windows and bright spaces promote transparency and interaction,
underlining AEC’s commitment to a sustainable environment
and well integrated into the surrounding landscape.

The logistics center is connected to the Headquarters via a 100 meter suspended industrial bridge: a fundamental element of the logistics chain as it guarantees a continuous flow of materials between the different production points.
The material is picked up from an automatic warehouse and transported
from special tracks inside the bridge, directly reaching the assembly lines of the new plant.

AEC Illuminazione, always at the forefront of innovation, designed the new factory with a 360-degree sustainable vision. The plant, equipped with an impressive photovoltaic system with a peak of 1.43 megawatts, represents a concrete example of how it is possible to combine industrial production and respect for the environment.

Assembly&Logistic Center represents
our commitment to excellence and innovation.
An important step for the future, serving our customers and partners.

Our experience and attention to detail make the difference, ensuring
that every phase of the process is managed with the utmost professionalism.

60 years of history: Who is AEC Illuminazione

Corporate

Discover our projects around the world

Projects